CX-029797: Upgrading Building 233-H STCS to Meet SC and SDC-3 Requirements Conceptual Design Package (CDP)

The existing Seismic Detection Subsystem and a Tritium Confinement Subsystem (STCS) was designed in the late 1980's to confine tritium in seismical…

Office of NEPA Policy and Compliance

January 17, 2024
minute read time

The existing Seismic Detection Subsystem and a Tritium Confinement Subsystem (STCS) was designed in the late 1980's to confine tritium in seismically qualified vessels to prevent a large tritium release that could challenge the site boundary dose limit of 25 rem during a DBE.