The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer a…
Office of NEPA Policy and Compliance
January 17, 2024The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer and concurrently have construction create a 12-inch port in the side of the FTS glovebox blister.