CX-029734: ED-FO TAD LAKE RE-ROUTE

Re-route of structures 34-5 through 35-4 of ED-FO line downed by flood. This will involve a combination of steel and wood poles on three peninsular…

Office of NEPA Policy and Compliance

October 16, 2023
minute read time

Re-route of structures 34-5 through 35-4 of ED-FO line downed by flood. This will involve a combination of steel and wood poles on three peninsular.