CX-029722: FY24 Benton-White Bluffs Expedited Priority Pole Traditional Method Replacements

Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and associated hardware and guy wires at specific …

Office of NEPA Policy and Compliance

January 22, 2024
minute read time

Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and associated hardware and guy wires at specific locations in BPA's Pasco District. The two structures proposed for replacement include Benton-White Bluffs No. 1 structures 7/7 and 8/1.