Install approximately 50 new poles and overhead fiber to Dominion Energy Substation 504-5G. Cable will be run on new poles installed within the exi…
Office of NEPA Policy and Compliance
November 7, 2023Install approximately 50 new poles and overhead fiber to Dominion Energy Substation 504-5G. Cable will be run on new poles installed within the existing DESC Right-of-way of the Barnwell-SRS (115KV) and Canadys (230KV) transmission lines entering the Site south of the Barnwell Barricade.