CX-029393: Cardwell-Cowlitz No 1 Transmission Tower Modifications (Update to previous CX issued on October 2, 2023)

Bonneville Power Administration (BPA) proposes to modify transmission structures 7/3 to 7/7 on the 115-kilovolt (kV) Cardwell-Cowlitz No. 1 transmi…

Office of NEPA Policy and Compliance

November 1, 2023
minute read time

Bonneville Power Administration (BPA) proposes to modify transmission structures 7/3 to 7/7 on the 115-kilovolt (kV) Cardwell-Cowlitz No. 1 transmission line in Cowlitz County, WA.