The project includes rehabbing an existing building for their project. This building was constructed on an old Brownfield site and is still being m…
Office of NEPA Policy and Compliance
October 26, 2023The project includes rehabbing an existing building for their project. This building was constructed on an old Brownfield site and is still being monitored with soil testing. The only new disturbance is installing a conveyor system to get from the rail spur to the existing building. All disturbed area will be kept onsite in a confined area properly marked.