It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…
Office of NEPA Policy and Compliance
July 12, 2023It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide power for welding machines and miscellaneous hand power tools.