CX-028635: Construction Temporary Power for Building 233-H

It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…

Office of NEPA Policy and Compliance

July 12, 2023
minute read time

It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide power for welding machines and miscellaneous hand power tools.