CX-028527: Horse Ranch Tap to Monroe-Snohomish Priority Pole Replacement Project

The Bonneville Power Administration (BPA) proposes to replace three deteriorating wood pole structures along the Horse Ranch Tap to Monroe-Snohomis…

Office of NEPA Policy and Compliance

July 13, 2023
minute read time

The Bonneville Power Administration (BPA) proposes to replace three deteriorating wood pole structures along the Horse Ranch Tap to Monroe-Snohomish 115 kV (kilovolts) transmission line.