A lithium hydroxide electrodialysis pilot plant would be placed inside of the existing spill berm in the 369 HIBAY or in 370 W158 in a purchased an…
Office of NEPA Policy and Compliance
October 17, 2022A lithium hydroxide electrodialysis pilot plant would be placed inside of the existing spill berm in the 369 HIBAY or in 370 W158 in a purchased and compatible spill berm.