CX-028398: Electrodialysis Pilot Plant Operations

A lithium hydroxide electrodialysis pilot plant would be placed inside of the existing spill berm in the 369 HIBAY or in 370 W158 in a purchased an…

Office of NEPA Policy and Compliance

October 17, 2022
minute read time

A lithium hydroxide electrodialysis pilot plant would be placed inside of the existing spill berm in the 369 HIBAY or in 370 W158 in a purchased and compatible spill berm.