Complete an initial engineering design study including an AACE Class 4 cost estimate for installing a CO2 capture facility at Filer City to capture…
Office of NEPA Policy and Compliance
May 15, 2023Complete an initial engineering design study including an AACE Class 4 cost estimate for installing a CO2 capture facility at Filer City to capture at least 500,000 net tonnes of CO2 per year.