CX-028250: Filer City BiCRS Net-Negative Study

Complete an initial engineering design study including an AACE Class 4 cost estimate for installing a CO2 capture facility at Filer City to capture…

Office of NEPA Policy and Compliance

May 15, 2023
minute read time

Complete an initial engineering design study including an AACE Class 4 cost estimate for installing a CO2 capture facility at Filer City to capture at least 500,000 net tonnes of CO2 per year.