CX-028091: Grizzly-Captain Jack No. 1 Access Road Maintenance and Ross – Malin Fiber Line Repair

The Bonneville Power Administration (BPA) proposes to repair fiber cable on the Grizzly – Captain Jack No. 1 transmission line between structures 1…

Office of NEPA Policy and Compliance

May 8, 2023
minute read time

The Bonneville Power Administration (BPA) proposes to repair fiber cable on the Grizzly – Captain Jack No. 1 transmission line between structures 130/2 to 133/5, 137/3 to 141/2, and 143/2 to 146/2 (about 10 Miles of fiber in total).