CX-028034: Road E Milling, Paving, and Striping

Road E (2.5 miles) will be milled 2-1/2 in, paved with 1 in Open Graded Interlayer (OGI) and 2 in of asphalt, striped with thermoplastic and edge o…

Office of NEPA Policy and Compliance

April 24, 2023
minute read time

Road E (2.5 miles) will be milled 2-1/2 in, paved with 1 in Open Graded Interlayer (OGI) and 2 in of asphalt, striped with thermoplastic and edge of road dressed with top soil and grassing.