The purpose of this project is to return the emergency spillway at PAR Pond to as close to its original design configuration as feasible. The area …
Office of NEPA Policy and Compliance
April 19, 2023The purpose of this project is to return the emergency spillway at PAR Pond to as close to its original design configuration as feasible. The area has been surveyed for radiological contamination and none was identified. Radiological monitoring will be performed while work is in progress.