CX-027913: Chehalis-Raymond No. 1 2023 Access Road Improvements Project, Phase1

Bonneville Power Administration (BPA) is proposing to repair and install new sections of access road between structures 26/6 and 27/7 of the Chehal…

Office of NEPA Policy and Compliance

April 24, 2023
minute read time

Bonneville Power Administration (BPA) is proposing to repair and install new sections of access road between structures 26/6 and 27/7 of the Chehalis-Raymond No.1 115 kV transmission line.