Bonneville Power Administration (BPA) proposes to allow AT and T to upgrade existing equipment at the AT and T wireless site on the Monroe-Custer N…
Office of NEPA Policy and Compliance
April 17, 2023Bonneville Power Administration (BPA) proposes to allow AT and T to upgrade existing equipment at the AT and T wireless site on the Monroe-Custer No. 1 line on structure 70/3.