CX-027572: L0463 Columbia River PUD Deer Island Interconnection

Bonneville Power Administration (BPA) proposes to interconnect Columbia River Public Utilities District (CRPUD) newly constructed Deer Island subst…

Office of NEPA Policy and Compliance

February 21, 2023
minute read time

Bonneville Power Administration (BPA) proposes to interconnect Columbia River Public Utilities District (CRPUD) newly constructed Deer Island substation to BPA’s existing 115-kV St. Helens-Allston transmission line between structures 7/4 and 7/5.