Upon demolition of control room panel as part of FCA, it was discovered that a section of the control panel was integrated into the main corridor h…
Office of NEPA Policy and Compliance
December 7, 2022Upon demolition of control room panel as part of FCA, it was discovered that a section of the control panel was integrated into the main corridor hallway. The proposed activity will keep the back panel of the cabinet in place and replace the gypsum board in the interior of the control room.