CX-027132: Install New Firestop System (A-DCF-H-00297) and Install Rm 16 N2 Heater Temperature Interlock (J-DCFH-06233)

The proposed activities (PA's) are two design changes to building 233-H involving a new firewall penetration/fire stop system and a new interlock i…

Office of NEPA Policy and Compliance

October 10, 2022
minute read time

The proposed activities (PA's) are two design changes to building 233-H involving a new firewall penetration/fire stop system and a new interlock installation for the hot and cold nitrogen heater vessel T199-500-34.60.