Overflow liquid from the recycle sump waste encasement is assumed to be leaking into a breeched section of the 6” as-built abandoned and capped und…
Office of NEPA Policy and Compliance
August 31, 2022Overflow liquid from the recycle sump waste encasement is assumed to be leaking into a breeched section of the 6” as-built abandoned and capped underground process sewer drain pipe riser located at Northing 72671.5 and Easting 63178.83. W149228 Rev. 33 identifies a 2” riser being at this location, immediately west of the General Purpose Evaporator Facilities.