Isolation and removal of several pieces of equipment originally used by MOX from Building 226-2F to Building 717-F or to Building 711-1N for storag…
Office of NEPA Policy and Compliance
September 1, 2022Isolation and removal of several pieces of equipment originally used by MOX from Building 226-2F to Building 717-F or to Building 711-1N for storage until the equipment is needed in the 717-F machine shop. Preparation includes, but is not limited to, air gapping electrical and air lines that are connected to the equipment, removal of any residual coolant, and removal/relocation of equipment.