A new 69 kV transmission line 4.0 miles long will be constructed from the existing Winlock substation (corner of SW Kerron St. and Hining Ave.) to …

Office of NEPA Policy and Compliance

August 30, 2022
minute read time

A new 69 kV transmission line 4.0 miles long will be constructed from the existing Winlock substation (corner of SW Kerron St. and Hining Ave.) to Toledo Tap (corner of WA-505 and Henriot Rd.)