CX-026648: Pearl-Keeler No. 1 Line Impairment Improvements

Bonneville Power Administration (BPA) proposes to remove a critical transmission line impairment (P02646) along its Pearl-Keeler No. 1 transmission…

Office of NEPA Policy and Compliance

August 2, 2022
minute read time

Bonneville Power Administration (BPA) proposes to remove a critical transmission line impairment (P02646) along its Pearl-Keeler No. 1 transmission line between structures 10/3 and 11/1 in Washington County, Oregon. BPA is required to remove line impairments where the distance from the overhead transmission line conductor to the ground surface does not have adequate clearance for safe and reliable operation.