Bonneville Power Administration (BPA) proposes to remove a critical transmission line impairment (P02646) along its Pearl-Keeler No. 1 transmission…
Office of NEPA Policy and Compliance
August 2, 2022Bonneville Power Administration (BPA) proposes to remove a critical transmission line impairment (P02646) along its Pearl-Keeler No. 1 transmission line between structures 10/3 and 11/1 in Washington County, Oregon. BPA is required to remove line impairments where the distance from the overhead transmission line conductor to the ground surface does not have adequate clearance for safe and reliable operation.