CX-026508: Road 4 Milling, Paving, and Striping

Road 4 (2.8 miles) will be milled 2-1/2 in, paved with 1 in Open Graded Interlayer (OGI) and 2 in of asphalt, striped with thermoplastic and edge o…

Office of NEPA Policy and Compliance

July 6, 2022
minute read time

Road 4 (2.8 miles) will be milled 2-1/2 in, paved with 1 in Open Graded Interlayer (OGI) and 2 in of asphalt, striped with thermoplastic and edge of road dressed with top soil and grassing.