CX-026303: Chief Joseph – Monroe No. 1 Structure 43/6 Landing and Insulator Replacement

Bonneville Power Administration (BPA) proposes to perform landing work and insulator replacement on Chief Joseph – Monroe No. 1 structure 43/6 in t…

Office of NEPA Policy and Compliance

June 8, 2022
minute read time

Bonneville Power Administration (BPA) proposes to perform landing work and insulator replacement on Chief Joseph – Monroe No. 1 structure 43/6 in the Okanogan - Wenatchee National Forest. The project would entail about 50 feet of minor road grading and filling to reduce ruts within the access road and landing construction.