As part of planning activities for the Area 6 to U1a waterline replacement, subsurface utility discovery work would be performed along selected por…
Office of NEPA Policy and Compliance
November 28, 2018As part of planning activities for the Area 6 to U1a waterline replacement, subsurface utility discovery work would be performed along selected portions of the existing water lines located in Area 6 and Area 1 at the Nevada National Security Site (NNSS).