CX-025089: Montana Projects - Hungry Horse Radio Station Removal and Fiber Installation Project

The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two fiber optic cables on the Hungry Horse-Columbia Falls No. 1 transmission line to take their place.

Office of NEPA Policy and Compliance

November 17, 2021
minute read time

The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two fiber optic cables on the Hungry Horse-Columbia Falls No. 1 transmission line to take their place.