MSA/HMIS to perform siting, construction, modification, expansion, operation, and decommissioning of an onsite facility for storing packaged hazard…
Office of NEPA Policy and Compliance
December 12, 2020MSA/HMIS to perform siting, construction, modification, expansion, operation, and decommissioning of an onsite facility for storing packaged hazardous waste (as designated in 40 CFR part 261) for 90 days or less or for longer periods as provided in 40 CFR 262.34(d), (e),or (f) (such as accumulation or satellite areas).