CX-022709: Installation of EDM in Building 234-7H

Install an Electric Discharge Machine (EDM) in building 234-7H (room 109) that requires a chilled water unit, electrical supply, instrument air sup…

Office of NEPA Policy and Compliance

October 14, 2020
minute read time

Install an Electric Discharge Machine (EDM) in building 234-7H (room 109) that requires a chilled water unit, electrical supply, instrument air supply, de-ionized water supply and ventilation around water tank.