CX-022433: Building 83/58 Brick Repointing Project

Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch exist…

Office of NEPA Policy and Compliance

September 17, 2020
minute read time

Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch existing holes in brick and terra-cota block.