The Western Area Power Administration (WAPA), Sierra Nevada Region (SN), proposes toreplace tower 4/4 on the Carr-Keswick #1 and #2 (CAR-KE) transm…
Office of NEPA Policy and Compliance
April 9, 2020The Western Area Power Administration (WAPA), Sierra Nevada Region (SN), proposes toreplace tower 4/4 on the Carr-Keswick #1 and #2 (CAR-KE) transmission lines.