Up to 17 survey lines are proposed for SASW testing near seismic velocity boreholes and existing INL seismic stations at: ATR (Figure R-1A), NRF (F…
Office of NEPA Policy and Compliance
January 28, 2020Up to 17 survey lines are proposed for SASW testing near seismic velocity boreholes and existing INL seismic stations at: ATR (Figure R-1A), NRF (Figures R-2A and Figure R-2B), INTEC (Figure R-3), MFC (Figures R-4A and R-4B), and INEL-1 deep drill hole (Figure R-5).