The project objective is to install two 138kV transmission lines connecting Argonne's 551 substation with a new ComEd substation south of the Argon…
Office of NEPA Policy and Compliance
August 29, 2019The project objective is to install two 138kV transmission lines connecting Argonne's 551 substation with a new ComEd substation south of the Argonne site.