CX-021189: Removal of Modifications to ATR Control Room AC 670-HVA-2

The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…

Office of NEPA Policy and Compliance

January 13, 2020
minute read time

The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The modification, documented under EC INL-17-092, added four-inch branch ducts running from the supply duct of 670-HVA-2 to the individual Relay Cabinets (RC).