The proposed project would provide greater resiliency at the data centers in Building 12-37. The electrical system would be split into two separat…
Office of NEPA Policy and Compliance
April 1, 2019The proposed project would provide greater resiliency at the data centers in Building 12-37. The electrical system would be split into two separate systems, each with their own generator and Uninterruptible Power Supply (UPS). Both systems would be completely independent of each other.