BPA proposes to allow the installation of a water line and a corresponding water meter in BPA’s fee-owned right-of-way off of S. Thayer Road in the…
Office of NEPA Policy and Compliance
February 3, 2020BPA proposes to allow the installation of a water line and a corresponding water meter in BPA’s fee-owned right-of-way off of S. Thayer Road in the 10/1-10/3 section of the Ostrander-McLoughlin No. 1 transmission line.