CX-021167: Water Meter and Line Installation at S. Thayer Road

BPA proposes to allow the installation of a water line and a corresponding water meter in BPA’s fee-owned right-of-way off of S. Thayer Road in the…

Office of NEPA Policy and Compliance

February 3, 2020
minute read time

BPA proposes to allow the installation of a water line and a corresponding water meter in BPA’s fee-owned right-of-way off of S. Thayer Road in the 10/1-10/3 section of the Ostrander-McLoughlin No. 1 transmission line.