CX-021053: Pump Replacements

Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with low flow …

Office of NEPA Policy and Compliance

November 21, 2019
minute read time

Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with
low flow bladder pumps. One well location also needs a 4' X 4" concrete pad poured.