The Western Area Power Administration (WAPA) is proposing to replace broken/malfunctioning insulators on the Mead - Perkins (MED-PES) 500-kV transm…
Office of NEPA Policy and Compliance
October 30, 2019The Western Area Power Administration (WAPA) is proposing to replace broken/malfunctioning insulators on the Mead - Perkins (MED-PES) 500-kV transmission line at structure 229/3.