CX-020824: 660-4E TRU Pad 4 Preparation Work and Installation of NDA, NDE, and FGA

Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) e…

Office of NEPA Policy and Compliance

September 30, 2019
minute read time

Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) equipment.  All equipment will be installed on the existing TRU Pad 4.