Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace…
Office of NEPA Policy and Compliance
September 30, 2019Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace existing drain lines between polisher/grinder assemblies and the main drain line that runs in the back of 11033-007 (METL-007) and 11033-008 (METL-008) Hoods.