The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the…
Office of NEPA Policy and Compliance
September 30, 2019The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the existing Silicon Controlled Rectifier (SCR) from the circuit and install a large variable transformer to allow the DE vessel to operate at needed process temperatures.