CX-020822: Install Temporary Powerstat to Operate DE Vessel

The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the…

Office of NEPA Policy and Compliance

September 30, 2019
minute read time

The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the existing Silicon Controlled Rectifier (SCR) from the circuit and install a large variable transformer to allow the DE vessel to operate at needed process temperatures.