The project team will conduct a Front-End Engineering and Design (FEED) study for a commercial-scale carbon capture system at an existing natural g…
Office of NEPA Policy and Compliance
September 20, 2019The project team will conduct a Front-End Engineering and Design (FEED) study for a commercial-scale carbon capture system at an existing natural gas combined cycle power plant of at least 375 Mwe.