CX-020557: Sand Creek-Bonners Ferry No. 1 Span 14/4 Impairment Remedy Project

Bonneville Power Administration (BPA) proposes to excavate and regrade a mounded earthen impairment to the Sand Creek-Bonners Ferry No. 1 transmiss…

Office of NEPA Policy and Compliance

August 16, 2019
minute read time

Bonneville Power Administration (BPA) proposes to excavate and regrade a mounded earthen impairment to the Sand Creek-Bonners Ferry No. 1 transmission line near structure 14/4 in line mile 14. BPA has identified an impairment to the line where the clearance between the energized conductor and the ground surface does not meet industry safety and reliability standards.