CX-020544: Allston-Driscoll No. 2 Access Road Improvement Project

Bonneville Power Administration (BPA) is proposing to improve access roads along the Alston-Driscoll No. 2 Transmission Line. The proposed project …

Office of NEPA Policy and Compliance

September 11, 2019
minute read time

Bonneville Power Administration (BPA) is proposing to improve access roads along the Alston-Driscoll No. 2 Transmission Line. The proposed project would occur within Columbia and Clatsop counties, Oregon. The project would be completed in two phases. Phase I, scheduled for construction in fall 2019, would construct or repair approximately 5.36 miles of access roads between structures 3/3-5/6, 8/2-10/4, and 20/1-20/3, and install necessary drainage features including 6 culverts.