The U.S. Department of Energy, Richland Operations Office, Infrastructure and Services Division proposes to remove and reroute portions of the 100 …
Office of NEPA Policy and Compliance
July 10, 2019The U.S. Department of Energy, Richland Operations Office, Infrastructure and Services Division proposes to remove and reroute portions of the 100 Area 13.8 kilovolt electrical distribution system (powerlines C0-L3, C9-L4, and a portion of C8-L14) to align with current and future power demands in the 100-B, 100-K, and 100-D Areas of the Hanford Site.