The overall goal of the proposed work is to design, construct, and test an ash fouling free air pre-heater to reduce minimum load requirements, inc…
Office of NEPA Policy and Compliance
July 16, 2019The overall goal of the proposed work is to design, construct, and test an ash fouling free air pre-heater to reduce minimum load requirements, increase overall efficiency, and reduce NH3 usage.