CX-020156: Direct Assessment and Repair of Big Hill-SUN 36-inch CO Pipeline

Subcontractor shall provide all supervision, transportation, labor, materials and equipment to locate, excavate, and inspect an internal corrosion …

Office of NEPA Policy and Compliance

June 11, 2019
minute read time

Subcontractor shall provide all supervision, transportation, labor, materials and equipment to locate, excavate, and inspect an internal corrosion anomaly at one location on the Big Hill to SUN Terminal 36-inch diameter, 0.500" w.t., API 5LX52 crude oil (CO) pipeline. The maximum allowable operating pressure (MAOP) of this pipeline is 720 PSIG. Repairs shall be performed based on the inspection results. Approximately 20 linear feet of pipe will be uncovered, cleaned, and prepared for inspection of the pipeline.