This project would consist of the removal of the following trailers: 09-059, 09-060, 06-061, and 09-130.  The removal would be accomplished in two parts: 1) Before disassembly, the utilities would be locked out and disconnected from the trailers.  The contractor would then disassemble the trailers into sections for easier transport off of Pantex Plant, 2) After removal, the secondary contractor would cut and cap all utilities and remove all sidewalks, parking lots, rock/gravel, etc. and restore the site to native conditions.

CX-019273.pdf (1.07 MB)