Categorical Exclusion Determination
Office of NEPA Policy and Compliance
November 13, 2018The contractor shall replace all guy wires, hardware, flange bolts and fasteners at all levels of the Bryan Mound Department of Energy’s 190-foot Communication tower. An air terminal will be installed. The port entry will be grounded and bonded. The vendor shall also ensure the proper operations of the strobe and its’ controller through repair or replacement of its components.