Categorical Exclusion Determination
Office of NEPA Policy and Compliance
October 31, 2018Bonneville Power Administration plans to modify structures on its Spirit Tap to Colville-Boundary transmission line where it enters Avista’s Spirit Substation and to replace two aging wood-pole structures on the same line. The work would ensure connection of Bonneville Power Administration’s line to a new transformer Avista plans to install at their Spirit Substation in Stevens County, Washington.